Weddington, NC

PHASE 1
This is the initial phase where we have conversations with our client to discuss the challenges they’re facing with their home and brainstorm solutions leveraging our design and planning team.

What challenges is our client leveraging us to solve?

image.png
  • Full main floor replacement.

  • Reconfiguring kitchen and pantry layouts to improve functionality and utilities.

  • Upgrading bathrooms with modern finishes and efficient layouts.

  • Evaluating and planning the attic conversion into a compliant, functional office space.

PHASE 2
(Design & Planning)

Areas we're renovating and details we'll work on  

Kitchen:

  • Sink stays on current location.

  • Dishwasher on island.

  • New appliances. 

  • Move the range to the left of the window.

  • Oven next to the range.

  • Move the fridge to the door and coffee machine next to it with open cabinet. (hardwire to be installed)

  • Rectangular island.

 

Pantry:

  • Expand and remodel the pantry area

  • Relocate/move a water shutoff valve that is currently in the pantry space (depending on the pantry option)

Master Bathroom:

  • Install a new freestanding tub

  • Replace the tile flooring

  • Install a new vanity and countertop, new sink and toilet.

 

Other Bathrooms:

  • Replace the tile flooring in the other bathrooms

  • Install new vanities and countertops, sinks. New toilet.

 

Attic:

  • Potential to add storage space and an office area in the attic

  • May add a new bathroom in the attic space

  • Install new HVAC in the attic

Before Renovation

image.png
image.png
image.png
image.png
image.png
image.png
image.png
image.png
image.png

During our initial visit, we walked through the home to better understand the clients’ vision and identify key opportunities. That walkthrough laid the foundation for a focused and functional design plan.

We developed 2D layout options to explore different configurations and improve flow and functionality. These drawings guided our next steps in planning.

image.png
image.png

We met with the homeowners to review layout options, materials, and overall design direction. These sessions helped refine the plan to align with their vision and priorities.

Inspiration images served as a reference point for material choices, layout adjustments, and the overall design vision.

image.png

FINAL RENDERS

1.jpg
WhatsApp Image 2026-01-27 at 08.37.01.jpeg
6.jpg
5.jpg
4.jpg
3.jpg
8.jpg

PHASE 3 
(CONSTRUCTION)

Starting the kitchen renovation! Demolition underway as we clear out the old and plan the new layout.

WhatsApp Image 2026-01-21 at 16.26.13.jpeg
WhatsApp Image 2026-01-23 at 17.34.27.jpeg

Tile demolition completed in bathrooms, ready for the next phase of renovation.

Hardwood flooring demolition underway, removing existing floors to prepare for the new installation.

WhatsApp Image 2026-01-23 at 17.34.28.jpeg
image.png

Plumbing rough-ins ongoing, ensuring proper layout and connections.

Mechanical systems being installed as part of the current phase.

image.png

Progress on the attic renovation continues, preparing for the next phase.

Kitchen renovation moving forward, shaping the space for its new layout and design.

Cabinet installation moving forward, shaping the space for the next steps.

Built-in cabinet installation in progress, with the main shelving structure framed and positioned as work continues.

WhatsApp Image 2026-02-20 at 14.26.35.jpeg

Wall insulation installed and shower area prepped, with framing and subfloor ready for liner installation as the process moves forward.

Kitchen cabinet installation underway, with island bases positioned and hood ventilation roughed in as layout takes shape.

WhatsApp Image 2026-02-20 at 14.26.36.jpeg
WhatsApp Image 2026-02-25 at 11.10.20.jpeg

Subfloor prepped and uncoupling membrane installed, creating a stable foundation for the upcoming tile installation.

Drywall installation underway, with walls being enclosed and prepped for the next stages of finishing work.

WhatsApp Image 2026-02-26 at 16.21.02.jpeg

Attic bathroom shower tile installation in progress, with wall tiles set and leveling clips securing alignment as the space takes shape.

Temporary floor protection installed to preserve the existing flooring and ensure it remains undamaged during construction.

WhatsApp Image 2026-03-06 at 17.27.32.jpeg
WhatsApp Image 2026-03-09 at 17.00.21.jpeg

Kitchen countertops successfully installed and ready for the next phase of the project.

Kitchen farmhouse sink installed, adding both functionality and character to the space.

WhatsApp Image 2026-03-09 at 17.00.21 (1).jpeg
WhatsApp Image 2026-03-10 at 14.19.02.jpeg

Backsplash installation in progress as the kitchen finishes continue to take shape.

Carpet repairs completed to improve the condition and appearance of the existing flooring.

WhatsApp Image 2026-03-11 at 14.49.08.jpeg
WhatsApp Image 2026-03-11 at 18.24.22.jpeg

Kitchen hood installed, completing an essential ventilation element of the kitchen.

Steady progress across the kitchen and main floor as multiple updates come together.

Attic renovation progressing as structural and finishing work moves forward.

Flooring installation in the master bathroom underway as the renovation continues to progress.

Attic flooring upgrade with new carpet installation.

Pantry cabinetry and shelving fitted for optimal organization.

WhatsApp Image 2026-04-13 at 04.23.35.jpeg
WhatsApp Image 2026-04-13 at 04.23.35 (1).jpeg

Custom kitchen island installed as a central feature.

Refrigerator installed with surrounding cabinetry in place.

WhatsApp Image 2026-04-13 at 04.23.35 (2).jpeg
WhatsApp Image 2026-04-13 at 04.23.36 (1).jpeg

Kitchen island drawers in place, enhancing functionality

Kitchen range and hood fitted for full functionality.

WhatsApp Image 2026-04-13 at 04.24.32.jpeg
WhatsApp Image 2026-04-13 at 04.23.36.jpeg

Custom shelving installed in the kitchen area.

Painting phase underway, bringing the space together.

WhatsApp Image 2026-04-13 at 04.23.36 (2).jpeg
WhatsApp Image 2026-04-13 at 04.24.32 (2).jpeg

Ongoing kitchen transformation.

Kitchen build advancing toward completion.

WhatsApp Image 2026-04-13 at 04.24.32 (1).jpeg

Excited to share with you the finished project!

001_img_2290_with_fire.jpg
004_img_2296.jpg
005_img_2311.jpg
006_img_2316.jpg
010_img_2336.jpg
007_img_2321.jpg
011_img_2341_with_fire.jpg
013_img_2351_with_fire.jpg
015_img_2361.jpg
018_img_2376.jpg
021_img_2391_with_fire.jpg
022_img_2396.jpg
023_img_2301.jpg
024_img_2306.jpg
030_img_2225.jpg
037_img_2235.jpg
040_img_2250.jpg
042_img_2260.jpg
043_img_2265.jpg
036_img_2220.jpg
034_img_2210.jpg
035_img_2215.jpg
028_img_2194.jpg
025_img_2179.jpg
032_img_2199.jpg
bottom of page