top of page

Charlotte, NC

WhatsApp Image 2024-03-07 at 12.24.35.jpeg

PHASE 1
This is the initial phase where we have conversations with our client to discuss the challenges they’re facing with their home and brainstorm solutions leveraging our design and planning team.

What challenges is our client leveraging us to solve?

  • Optimize functional workspace layout by modifying wall layouts to improve flow and operational efficiency across the spa.

  • Improve client experience through new flooring, fresh paint, installation of TVs in all offices, and custom signage.

PHASE 2
(Design and Planning)

WhatsApp Image 2024-03-07 at 12.22.34 (1).jpeg

DEMOLISHING WALLS

PREPARATION FOR DRY WALL

WhatsApp Image 2024-03-07 at 12.22.34.jpeg
WhatsApp Image 2024-03-07 at 12.23.08.jpeg

INSTALING ELECTRONICS

MED SPA FULLY RENOVATED

WhatsApp Image 2024-03-07 at 12.24.35.jpeg

PROJECT GALLERY

bottom of page