Fort Mill, SC

PHASE 1
This is the initial phase where we have conversations with our client to discuss the challenges they’re facing with their home and brainstorm solutions leveraging our design and planning team.

What challenges is our client leveraging us to solve?

IMG_9622.HEIC
  • We’re turning this backyard into a functional outdoor space, with a covered patio, full kitchen, and built-in privacy for everyday living and hosting.

  • An outdoor kitchen, A-frame patio, and smart lighting, this project is all about practical upgrades for relaxed, private outdoor living.

IMG_9624.HEIC

PHASE 2
(Design & Planning)

Areas we're renovating and details we'll work on  

  • Outdoor kitchen

  • Covered patio

  • Privacy wall

  • Bar seating area

  • Outdoor sink and fridge zone

  • Lighting and electrical layout

  • Planter/herb garden area

During our initial visit, we walked through the home to better understand the clients’ vision and identify key opportunities. That walkthrough laid the foundation for a focused and functional design plan.

We developed 2D layout options to explore different configurations and improve flow and functionality. These drawings guided our next steps in planning.

image.png
image.png

We met with the homeowners to review layout options, materials, and overall design direction. These sessions helped refine the plan to align with their vision and priorities.

Inspiration images served as a reference point for material choices, layout adjustments, and the overall design vision.

image.png

FINAL RENDERS

WhatsApp Image 2025-10-30 at 06.04.05.jpeg
WhatsApp Image 2025-10-30 at 06.04.18.jpeg

PHASE 3 
(CONSTRUCTION)

Footing soil test completed, confirming ground stability for the upcoming foundation work.

WhatsApp Image 2025-10-22 at 08.15.05.jpeg
WhatsApp Image 2025-10-22 at 08.16.25.jpeg

Sliding door in process.

Sliding door and trim done.

WhatsApp Image 2025-10-24 at 12.31.47.jpeg
WhatsApp Image 2025-10-27 at 10.56.32.jpeg

Footing rebar done.

Ready for inspection.

Footing rebar done.

Ready for inspection.

WhatsApp Image 2025-11-13 at 18.14.04 (1).jpeg
WhatsApp Image 2025-11-13 at 18.14.04.jpeg

Footing rebar done.

Ready for inspection.

Footing rebar done.

Ready for inspection.

WhatsApp Image 2025-11-13 at 18.14.03 (1).jpeg

To Be Continued...