Loxley Group

CHARLOTTE, NC
PHASE 1
(Evaluation for Problems & Solutions)
Kitchen Renovation:
-
Custom kitchen cabinets
-
New backsplash
-
Butcher block countertop
-
High-end appliances
-
house extension towards the front
​​
​
House Extension Towards Front:
-
Custom mudroom with cabinets and bench
-
Brand new entrance
General Renovations:
-
New flooring
-
New baseboard
-
New doors
-
New windows
-
Updated stairs up to code
-
New electrical circuit
​
Basement:
-
Insolation replacement
-
New drywall
PHASE 2
(Design and Planning)

First On-Site Meeting
Measurements & 3D Scans


2D Layouts (proposed)
Design Meetings


Our 3D layout offers a preliminary look at your design, helping you visualize the space. Remember, it's a starting point; final details may vary.
These detailed drawings ensure accurate planning and execution for a perfectly tailored space.


Moodboard Inspo
This beautiful kitchen render helps you see what your material choices will look like in your space.

With its beautiful butcher block countertop and stunning waterfall edge this kitchen is both warm and sophisticated.


We pride ourselves on ensuring we are bringing your dream space to life by prioritizing communication along the way.
Cleaning out the old to make way for a total transformation.
PHASE 3 "CONSTRUCTION"



The framing process is underway. This critical step ensures the space is built to last and ready for the next phases.
We are focused on preparing the space safely and efficiently.


After removing the rotting wood, we treat for mold and mildew, ensuring the remaining wood is properly treated for a lasting solution.
Reinforcing the porch ceiling by securing joists and adding framing to prepare for the mudroom installation.
.jpeg)

Preparing the space by establishing the structural framework, setting the foundation for the next steps in the renovation process.
Renovation in progress with exposed framing, partial insulation, and ongoing carpentry.


Exposed framing, subfloors, and visible wiring. Natural light highlights ongoing structural, electrical, and carpentry work.
Structural updates in progress, highlighting preparation for siding installation and integration with the existing design.
.jpeg)

Renovation in progress.
Floor insulation installed, framing exposed, and subfloor work in progress.


Subfloor is in, framing exposed, and prep work moving forward.
New subfloor installed, framing exposed, and insulation in progress.
